Categories

Contact Us

Multiple-effect Evaporator

Multi-effect Evaporation system can widely used in the concentration of the glucose, starch sugar, maltose, milk, juice, vitamin C, maltodextrin and other aqueous solution.

Structure and character

Multi-effect Evaporation system is suitable to food and drink processing, pharmaceutical, chemical, biological engineering, environmental engineering, waste recycling and other sectors of high concentration, high viscosity, also with insoluble solids to low concentration.Multi-effect Evaporation system can widely used in the concentration of the glucose, starch sugar, maltose, milk, juice, vitamin C, maltodextrin and other aqueous solution. And also widely used in liquid waste disposal such as industry field of gourmet powder, alcohol and fishmeal.

Main Feature

1 It has short heating time, fits for heat sensitive product. Continuous feeding & discharging, product could get concentrated in one time, and retention time is less than 3 minutes 2 Compact structure, it could finish product pre-heating and concentrating in one time, to save the extra cost of pre-heater, reduce the risk of cross contamination, and occupied space 3 It fits for processing high concentrated & high viscosity product 4 Three effect design saves steam 5 The evaporator is easy for clean, there’s no need of dismantle when cleaning the machine 6 Half Automatic operation 7 No product leakage

Description

Raw material is fed into pre-heating swirl pipe from storage tank via pump. The liquid is getting heated by vapor from thirdly effect evaporator, then it enters the distributor of thirdly evaporator, fall down to become the liquid film, evaporated by the vapor from secondary evaporator. The vapor moves along with the concentrated liquid, enters thirdly separator, and separated from each other. Concentrated liquid comes to the secondary evaporator through pump, and get evaporated again by the vapor from the first evaporator, and the above process repeat again. The first effect evaporator need fresh steam supply.
Project Single-effect Double-effect Triple-effect Four-effect Five-effect
Water evaporation capacity (kg/h) 100-2000 500-4000 1000-5000 8000-40000 10000-60000
Steam pressure 0.5-0.8Mpa
Steam consumption/evaporation capacity (With thermal compression pump) 0.65 0.38 0.28 0.23 0.19
Steam pressure 0.1-0.4Mpa
Steam consumption/evaporation capacity 1.1 0.57 0.39 0.29 0.23
Evaporation temperature (℃) 45-95℃
Cooling water consumption/evaporation capacity 28 11 8 7 6
Remark: In addition to the specifications in the table, can be separately designed according to customer’s specific material.

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.