Categories

Contact Us

Multifunctional Chinese Herb Extraction Equipment

Multifunctional Chinese Herb extraction equipment

Multifunctional Chinese Herb extraction equipment

Structure and character

Main Feature

Spec: 1.Material: ss304 and ss316l 2.Capacity: 50L to 10000L 3.Design according to GMP   Model: 1.Normal Taper type extracting tank (Traditional type) 2.Straight Cylindrical type extracting tank 3.Upside-down Taper type extracting tank 4.Upper discharging type extracting tank (New arrival )   Structure: Collecting machine, condenser, cooler, filter, oil & water separator and mist eliminator. Application : This machine is special applicable for extracting effective constituent from roots, stems, leaves, flowers, fruits and seeds of plants, or brains, bones and organs of animals , or natural minerals by liquid solvents, such as water, alcohol, acetone and so on.   The equipment is applicable to the project operations of water decocting under normal and compressed pressure, temperature dipping, thermal refluxing , forced circulation, diacolation, extraction of aroma oil and reclamation of organic solvent,etc, which are in such industries as Chinese traditional medicine, plants, animals,food and chemistry. And especially, it is more efficient in the case of dynamic or counter current extraction, such as shortening time, getting high pharmacy  content, etc. Technical features: 1.The discharge door driven by pneumatic force, safety locking type, without  leakage and won’t open automatically under sudden power failure, operated safety and reliably. 2.The foam destroyer is quick-open type, easy for cleaning and operating. 3.Ached filter screen, long circle hole filter structure, enlarge its filtration area and the screen won’t get jammed at the same time.  
Model TQ-0.5 TQ-1 TQ-2 TQ-3 TQ-4 TQ-6
Total Volume L 600 1200 2300 3200 4300 6300
Inside design pressure Mpa 0.09
Jacket design pressure Mpa 0.3
Manhole diameter mm 400 400 400 400 400 500
Heat area ㎡ 1.7 3 4.7 6.3 8 12
Condenser area ㎡ 4 5 8 10 15 20
Cooling area ㎡ 0.5 1 1 1.5 2 2
Slag door diameter mm 500 800 800 800 1000 1400
Steam consumption kg/h 160 245 325 345 430 645
Cooling water consumption T/h 6 8 10 15 20 25
Motor power kw 2.2 3.0 4.0 5.5 5.5 7.5
Mixing speed r/min 36 36 36 36 36 36
-2 -1 -3-4-5

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.