Categories

Contact Us

Mix Tank with Agit for Sale

Mix Tank with Agit for Sale is mainly used for mixing, blending, blending and homogenizing of materials. The design structure and configuration can be standardized and humanized according to the requirements of the production process.

Structure and character

Main Feature

Overview Mix Tank with Agit for Sale is mainly used for mixing, blending, blending and homogenizing of materials. The design structure and configuration can be standardized and humanized according to the requirements of the production process. In the mixing process, the mixing tank can realize feeding control, discharging control, stirring control and other manual automatic control, etc. It is widely used in coating, medicine, building materials, chemical, pigment, resin, food, scientific research and other industries. Mix Tank with Agit for Sale can be made of carbon steel, stainless steel and other materials according to the process requirements of users’ products to meet different process and production needs. The equipment has reasonable structure design, advanced technology, durable, simple operation, easy to use and other characteristics. It is the ideal chemical equipment with low investment, fast production and high income. Specification
Material: SS304 or SS316L
Design Pressure: -1 -10 Bar (g) or ATM
Work Temperature 0-200 °C
Volumes: 50~50000L
Construction : Vertical type or Horizontal type
Jacket type : Dimple jacket, full jacket, or coil jacket
Agitator type: Paddle, anchor, scraper, homogenizer, etc
Structure : Single layer vessel, vessel with jacket, vessel with jacket and insulation
Heating or cooling function According to the heating or cooling requirement ,the tank will have jacket for required
Optional Motor: ABB, Siemens, SEW or Chinese brand
Surface Finish: Mirror Polish or Matt polish or Acid wash&pickling or 2B
Standard components : Manhole,sight glass , cleaning ball,
Optional components : Vent filter, Temp. Gauge, display on the gauge directly on the vessel Temp sensor PT100
-1-3-2-3-4-5

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.