Categories

Contact Us

Food Concentration Tank

The Equipment Is Mainly Composed Of A Concentration Tank, A Heater, A Condenser, A Vapor-Liquid Separator, A Liquid Receiving Tank, A Cooler, Etc., And A Vacuum System Is Additionally Provided.

Structure and character

image001

Food concentration tanks are suitable for concentration and extraction of high-viscosity materials such as jam, chili sauce, and tomato paste. It is based on vacuum concentration technology and is equipped with a vacuum system to achieve continuous concentration at low temperature, which can effectively reduce the concentration time and reduce the damage to the active ingredients in the feed liquid. The equipment mainly includes shrink tank, heater, condenser, vapor-liquid separator, liquid receiving tank, cooler and other parts, which are durable. In addition, we can provide customized services according to your actual needs.

Main Feature

1. The equipment is fully equipped, and it has a reasonable and compact structure design so it does not require a lot of storage space. 2. The equipment fully complies with GMP safety and health standards, so you can use it with confidence. 3. Compared with the general compression method, vacuum concentration will not cause great damage to the active ingredients of the feed liquid. 4. The food concentration tank can be equipped with an automatic system to further improve the processing efficiency.

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.