The equipment is designed with advanced technology, united with extractor and outer-circulation evaporator together to proceed extracting and concentrator process at the same in this machine unit
The Extraction and Concentration Unit is a device widely used in the pharmaceutical and health food industries and commonly used in the extraction and concentration of Chinese herbal medicine, alcohol recovery, and other processing processes. The extractor is combined with the external circulation evaporator, so it can extract and concentrate at the same time. Because its production process has been upgraded, it has low energy consumption, a higher regional rate, and a short production cycle. At the same time, the specific gravity of the concentrated extract can finally reach 1.3. Our products have compact structures and reasonable designs, including extraction tanks, concentration tanks, explosion-proof water ring vacuum pumps, heating systems, pipes and valves.
| Specification Type | WTN—50 | WTN—100 | WTN—200 |
| Volume ( L) | 50 | 100 | 200 |
| Inner tank operating pressure (Mpa) | Normal pressure | Normal pressure | Normal pressure |
| Jacket operating pressure (Mpa) | Normal pressure | Normal pressure | Normal pressure |
| Compressed air (Mpa) | 0.7 | 0.7 | 0.7 |
| Feeding port diameter (mm) | 150 | 150 | 200 |
| Condensing cooling area(m2) | 3 | 4 | 5 |
| Discharge gate diameter (mm) | 200 | 300 | 400 |
| Boundary dimension (mm) | 2650×950×2700 | 3000×1100×3000 | 3100×1200×3500 |
1. Q : How can customer know the processes of order?
A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.
2. Q : Do you supply installation equipment in oversea?
A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.
3. Q : How to control quality?
A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.
4. Q : What is the shipment schedule?
A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.