Categories

Contact Us

Alcohol Recovery Tower

Alcohol recovery tower

The Alcohol Recovery Tower, also known as the distillation Tower, can concentrate the alcohol and increase its concentration to 95%. It is an Alcohol Recovery device for food, pharmaceutical, chemical, and other industries. Because the boiling point of alcohol is low, you can use a temperature slightly higher than the boiling point of alcohol to heat and volatilize the dilute alcohol solution to be recovered, and then release pure alcohol gas to increase the concentration of alcohol solution, so as to recover alcohol. Its residue is less than 3%, meeting the environmental requirements.

Structure and character

Main Feature

Alcohol Recovery Tower uses efficient stainless steel corrugated packing. All materials in contact with the medium are made of stainless steel, so it has good anti-corrosion and corrosion resistance. The tower body adopts a removable U-shaped structure, so it is easy to heat. The upper and lower temperatures in the tower are constant, and the concentration-specific gravity of the effluent is qualified. This Alcohol Recovery Tower can generally be inspected once a year, and an overhaul is required only when the distillation effect is significantly reduced. Details 1. Material: SS304 and SS316L 2.Capacity :20l/h to 1000L/h 3.Final alcohol: 95% 4.Design: according to GMPs  
Model JH-200 JH-300 JH-400 JH-500 JH-600 JH-800
Tower section diameter mm 200 300 400 500 600 800
Tower height m 6 6 6 7.5 7.5 9
Kettle volume L 600 1120 1450 2200 2200 2200
Recovery capacity L/h 60-80 90-100 150-250 300-350 350-450 550-650
Weight kg 1300 1900 2500 4000 4800 7200
Overall size mm L 2500 2600 2800 3000 3500 4200
W 700 800 1000 1200 1400 1800
H 8000 9000 10000 11000 12000 14000
-1-2-3-3-4-5

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.