Categories

Contact Us

Extraction and Concentration Unit

The equipment is designed with advanced technology, united with extractor and outer-circulation evaporator together to proceed extracting and concentrator process at the same in this machine unit

The Extraction and Concentration Unit is a device widely used in the pharmaceutical and health food industries and commonly used in the extraction and concentration of Chinese herbal medicine, alcohol recovery, and other processing processes. The extractor is combined with the external circulation evaporator, so it can extract and concentrate at the same time. Because its production process has been upgraded, it has low energy consumption, a higher regional rate, and a short production cycle. At the same time, the specific gravity of the concentrated extract can finally reach 1.3. Our products have compact structures and reasonable designs, including extraction tanks, concentration tanks, explosion-proof water ring vacuum pumps, heating systems, pipes and valves.

Structure and character

Main Feature

The Extraction and Concentration Unit integrates extraction, vacuum concentration, solvent recovery, and other functions, and can realize operations such as normal temperature extraction, low-temperature extraction, low-temperature circulation, and low-temperature concentration. Its processing temperature can be flexibly controlled, so it is very friendly for some materials sensitive to high temperatures. You can select the PLC control system to help improve the convenience of parameter adjustment and device control. High-quality stainless steel makes the Extraction and Concentration Unit durable and can be used in a wide range of media. -8
Specification Type WTN—50 WTN—100 WTN—200
Volume   ( L) 50 100 200
Inner tank operating pressure   (Mpa) Normal pressure Normal pressure Normal pressure
Jacket operating pressure   (Mpa) Normal pressure Normal pressure Normal pressure
Compressed air (Mpa) 0.7 0.7 0.7
Feeding port diameter (mm) 150 150 200
Condensing cooling area(m2) 3 4 5
Discharge gate diameter (mm) 200 300 400
Boundary dimension (mm) 2650×950×2700 3000×1100×3000 3100×1200×3500

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.