Categories

Contact Us

MVR Forced Circulation Evaporator For Waste Water Process

Double effect forced circulation evaporator for waste water process

MVR Forced Circulation Evaporator For Waste Water Process

Structure and character

Main Feature

1)Main driven power of MVR evaporation system is electric energy. Electric energy transfer to mechanical energy and improve the quality of second steam which is more economic than produce or purchase fresh steam. 2)Under most of the evaporation process, system no need fresh steam during operation. Only need some steam compensation for pre-heating the raw material when heat energy from product discharged or mother liquid cannot be recycled due to process requirement. 3)No need independent condenser for second steam condensation, so no need circulating cooling water. Water resource and electric energy will be saved. 4)Compared with traditional evaporators, MVR evaporator temperature difference is much smaller, can achieve moderate evaporation,greatly improve product quality and reduce fouling. 5)Evaporation temperature of system can be controlled and very suitable for evaporation an concentration of thermal sensitive product. 6)Lowest energy consumption and operation cost,electricity consumption of one ton water’s evaporation is 2.2ks/C.

Application

Applied to multiple areas, such as: “zero release” solution for industrial waste water, Evaporation and concentration for process industry, food fermentation (aginomoto, citric acid, starch and sugar), pharmacy (traditional Chinesemedicine preparation, low temperature concentration of western medicine), fine chemical (pesticide, synthetic dyes, organic pigments, paints, spice and essence, cosmetic), chlorine chemical (salt water concentration), seawater desalt and metallurgical industry, etc. Technical characteristics 1,Low energy consumption,low operation cost 2,Small space occupation 3,Require fewer public utilities and less total investment 4,Stable operation and high degree of automation 5,Require no primary steam 6,Short retention time due to frequently used single effect 7,Simple process,high practicability,and excellent service performance at some loads 8,Low operation costs 9,Capable of evaporating at and below 40 celsius without any refrigerating plant and therefore particulary suitable for heat sensitive materials. -1 -2 -3-4-5

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.