Categories

Contact Us

Reactor Tank

1. Tank body: stainless steel (SUS304, SUS316L) material, the inner surface of the mirror polishing,
2. Can be online CIP cleaning, SIP sterilization, in line with health norms
3. Mixing device: optional box-type, anchor type, such as pulp
4. Heating and cooling: steam heating or electric heating can be used

Structure and character

Main Feature

Reactor tank

-_01

Reference technical parameters

1. Tank body: stainless steel (SUS304, SUS316L) material, the inner surface of the mirror polishing, 2. Can be online CIP cleaning, SIP sterilization, in line with health norms 3. Mixing device: optional box-type, anchor type, such as pulp 4. Heating and cooling: steam heating or electric heating can be used 5. Stirring shaft seal with pressure hygiene mechanical seal device to maintain the working pressure inside the tank and to prevent leakage of materials within the tank. 6. Support type According to the operational requirements of the use of hanging ear-type or floor leg type. This reactor is used for hydrolysis, neutralization, crystallization, distillation and evaporation in the fields as medicine,chemicals, food, light industry etc. The reactor body is made of sus304, sus316l stainless steel. Several mixing type is available

Structure

1. The equipment is mainly composed of three parts: a cylinder, an integral jacket and an outer covering. The outer covering and the jacket are filled with insulation medium, and the tank top is equipped with a stirrer. 2. The pressure inside the jacket is determined according to customer requirements. 3. The materials are all high-quality stainless steel. Characteristics: 1. Applicable for concocting finished products or mixing different phases of materials in coating, dyes, pigments, printing inks, pesticide and paper-making industries, etc. It can be fitted with many kinds of mixers, which are suitable for different working conditions. 2. As per different requirements, the kettle is able to be made into many types such as vacuum, normal-pressure, pressure-proof, cooling, heating and so on. 3. Various blades as paddle, frame and anchor with low speed running can be chosen. Also the kettle, normally with single layer structure can be made into normal pressure, pressure-proof types, etc.

Product Specification

image003

Our Features

    1.Applicable to the fields of food, dairy, beverage, pharmacy, cosmetic etc industry. a. Chemical Industry: Fat, Dissolvent, Resin, Paint, Pigment, Oil Agent etc. b. Food Industry: Yogurt, Ice Cream, Cheese, Soft Drink, Fruit Jelly, Ketchup, Oil, Syrup, Chocolate etc. c. Daily Chemicals: Facial Foam, Hair Gel, Hair Dyes, Toothpaste, Shampoo, Shoe Polish etc. d. Pharmacy: Nutrition Liquid, Chinese Traditional Patent Medicine, Biological Products etc. 2.Our mixer machine features: a, the mixer machine is of integrated framework design, solid and durable. b, mixer machine propeller processed after welding,high concentricity & steedy operation. c, mixer machine tank can be completely stirred by swirl type,makes a shorter mixing time. d, the mixer machine adopts stainless steel ensure a easy cleaning and rustlessness. e,mixer machine suitable for kinds of plastic material,feeds, powder and chemical industry.

Application

It is widely used in dairy industry, food industry, pharmacy, chemical industry, beverage and other industrial sectors, as heating, cooling, heat preservation, anti-corrosive, strong production capacity, Cooling, insulation, sterilization treatment or storage of slurry must be stainless steel tanks, especially for pasteurization of milk and insulation, ice cream production line is the necessary equipment.

QA&QC

Hot Tags: mix tank with agit for sale, China, suppliers, manufacturers, factory, customized, low price, made in China, Vacuum Evaporator Concentrator, Falling Film Evaporator, Vacuum Reduced Pressure Concentrator, Mix Tank with Agit for Sale, Mixer Tank, Extraction Tank

FAQ

1. Q : How can customer know the processes of order? A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself. 2. Q : Do you supply installation equipment in oversea? A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day. 3. Q : How to control quality? A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door. 4. Q : What is the shipment schedule? A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.