Categories

Contact Us

Stainless Steel Milk Cooling Tank

Used as mixing tank, blending tank etc. Ideal in fields such as foods, dairy products, fruit juice beverages, pharmacy, chemical industry and biological engineering etc.

Structure and character

Main Feature

Application

Used as mixing tank, blending tank etc. Ideal in fields such as foods, dairy products, fruit juice beverages, pharmacy, chemical industry and biological engineering etc. Milk cooling tank is mainly composed of tank body, stirrer, cleaning ball, refrigerate unit, electrical control box and so on five major components.

Description

It can be made into 3 layers, inner layer was the contact part with your raw material such as milk, juice or any other liquid product… outside the inner layer, there is a heating / cooling jacket for steam or hot water / cooling water. Then comes the outer shell. Between outer shell and the jacket, there is a 50mm thickness temperature preservation layer. Electric heating liquid mixing tank,liquid mixing tank,mixing tank with agitator
RFQ parameters of customized 500L electric heating liquid mixing tank with agitator
Material: SS304 or SS316L
Design Pressure: -1 -10 Bar (g) or ATM
Work Temperature: 0-200 °C
Volumes: 50~50000L
Construction : Vertical type or Horizontal type
Jacket type : Dimple jacket, full jacket, or coil jacket
Agitator type: Paddle, anchor, scraper, homogenizer, etc
Structure : Single layer vessel, vessel with jacket, vessel with jacket and insulation
Heating or cooling function: According to the heating or cooling requirement ,the tank will have jacket for required function
Optional Motor: ABB, Siemens, SEW or Chinese brand
Surface Finish: Mirror Polish or Matt polish or Acid wash&pickling or 2B
Standard components : Manhole,sight glass , cleaning ball,
Optional components : Vent filter, Temp. Gauge, display on the gauge directly on the vessel Temp sensor PT100

QA&QC

Hot Tags: mix tank with agit for sale, China, suppliers, manufacturers, factory, customized, low price, made in China, Vacuum Evaporator Concentrator, Falling Film Evaporator, Vacuum Reduced Pressure Concentrator, Mix Tank with Agit for Sale, Mixer Tank, Extraction Tank image005

FAQ:

1. Q : How can customer know the processes of order? A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself. 2. Q : Do you supply installation equipment in oversea? A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day. 3. Q : How to control quality? A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door. 4. Q : What is the shipment schedule? A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.