Emulsification tank is used to mix one or several materials (water solublesolid, liquid or jelly) with other liquid and then to hydrate it into Emulsionliquid.Chinz homogenization agitator can apply together with Center blade agitator and scraped suface agitatot.
CHINZ Kettle Bottom Homogeneous Emulsification Tank Machinery Equipment For Electric Heating Stirring Vacuuming Machine
Emulsification tank is used to mix one or several materials (water solublesolid, liquid or jelly) with other liquid and then to hydrate it into Emulsionliquid.Chinz homogenization agitator can apply together with Center blade agitator and scraped suface agitatot. That is the best agitator combination.The Emulsification tank adopts vertical circular design with dimple jacket, coil jacket and full jacket both for cooling and heating. The tilting bottom design is well for emptying. There are 316L and 304 stainless material for choosing.
● Operating performance
Emulsification tank with accessories (such as manhole ,inlet and outlet and valve etc.) are easy to operate and observe.
● Health Performance
Tank equipped with standard dished top and bottom type.All joints and inside of the tank is mirror finished without any dead angle and cleaned easily(Sanitary design). Surface roughness Ra ≤ 0.22μm.
● Insulation Performance
Insulation material is polyurethane foam, PU thickness up to 50 ~+100 mm, insulation stability (24 h temperature 2 ℃), heat medium low consumption of fast temperature changes can radically improve productivity and reduce the use of cost.
● Appearance Performance
Inner mirror polished and outside mat polished , outside roughness Ra ≤ 0.8μm.
Hot Tags: mix tank with agit for sale, China, suppliers, manufacturers, factory, customized, low price, made in China, Vacuum Evaporator Concentrator, Falling Film Evaporator, Vacuum Reduced Pressure Concentrator, Mix Tank with Agit for Sale, Mixer Tank, Extraction Tank
Product packaging:Strong seaworthy wooden case / Wooden support / Iron support
♦ LCL (Less container load) Pack by waterproof plastic film first,then pack by plywood
♦ FCL (Full container load) Fixed on wooden support by steel wire
♦ If large tank, pack by waterproof plastic film first, then fixed on wooden support by steel wire
1. Q : How can customer know the processes of order?
A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.
2. Q : Do you supply installation equipment in oversea?
A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.
3. Q : How to control quality?
A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.
4. Q : What is the shipment schedule?
A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.