Categories

Contact Us

Mix Tank with Agit

Materials are all sanitary stainless steel SUS 304/316L.

The mix tank with Agit is a piece of equipment that combines high performance with low investment costs. We chose sanitary grade stainless steel SUS 304/316L as its raw material, which not only makes it easy to clean and smooth surface, but also makes it directly in contact with food liquid. The equipment has a variety of heating methods to choose from, including electric heating jacket and hot water jacket. A good quality electric mixer allows the speed to be adjusted, and it will thoroughly mix and dissolve a variety of solid or liquid materials. Depending on your specific needs, the device can be manufactured as a three-layer structure with insulation.

Structure and character

Main Feature

1. The equipment can efficiently mix and dissolve various materials, including fruit juice, wine, milk, chemical solvents, etc. 2. The transition area of the inner wall of the tank adopts a circular arc transition to ensure sanitation without dead ends. 3. The high-quality stainless steel tank not only fully complies with food-grade standards, but also provides a good finish to simplify cleaning. 4. The mix tank with Agit can be equipped with automatic CIP nozzles to make cleaning more convenient. 5. Heating method: electric heating jacket, hot water jacket, etc. are optional. Parameter
Material: SS304 or SS316L
Design Pressure: -1 -10 Bar (g) or ATM
Work Temperature 0-200 °C
Volumes: 50~50000L
Construction : Vertical type or Horizontal type
Jacket type : Dimple jacket, full jacket, or coil jacket
Agitator type: Paddle, anchor, scraper, homogenizer, etc
Structure : Single layer vessel, vessel with jacket, vessel with jacket and insulation
Heating or cooling function According to the heating or cooling requirement ,the tank will have jacket for required
Optional Motor: ABB, Siemens, SEW or Chinese brand
Surface Finish: Mirror Polish or Matt polish or Acid wash&pickling or 2B
Standard components : Manhole,sight glass , cleaning ball,
Optional components : Vent filter, Temp. Gauge, display on the gauge directly on the vessel Temp sensor PT100
-1-2-3-4-5

QA&QC

FAQ:

1. Q : How can customer know the processes of order?

A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea? 

A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?

A : All material we use has material certification. Before any piece of equipment leaves CHINZ. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?

A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.